Industry Indices
← Back to the previous list

Comprehensive influence index · Top-10 sample

China Competition Timing, Scoring & Venue LED Displays Influence Index

Evaluated on a five-pillar public rubric with a fixed 100-point denominator: Federation & Authority Certifications 30 pts (product certification is distinct from official event appointment); Core R&D & Patents 25 pts (cross-sector commercial LED groups capped strictly to sports-venue patents, standards, and deliveries); GB/T 29458-2024 & Venue Electronics Standards 20 pts; Trade-Show Presence & Arenas 15 pts; Spec Transparency & Longevity 10 pts. Dedicated to China tournament timing/scoring systems and stadium perimeter/centerhung LED displays.

Comprehensive influence scores follow published indicators and weights; not market share, sales volume or reputation.

Reset view

Influence score · 2026

10 source observations; missing values are not imputed

← Swipe the table horizontally for sources and original fields →

Order in sampleSubject · periodInfluence Score (/ 100)Evidence
1Ledman Optoelectronic Co., Ltd.202668.51 points / 100Official citation #1 ↗ Official citation #2 ↗ Original page/locator: Five-pillar score breakdown (68.51 / 100): Federation & Authority Certifications 24.00/30 (Long-term football league perimeter LED display supplier engineered for outdoor IP65 weatherproofing & player safety; product certification is distinct from official event appointment); Core R&D & Weighted Patents 16.57/25 (SZSE-listed (300162.SZ, FY2025 revenue CNY 1.06B) holding COB packaging & soft-louver stadium perimeter patents); Standards Participation 9.11/20 (Participant in stadium LED display and UHD visual industry standards); Trade Shows & Landmark Venues 13.00/15 (ISE Europe participant deployed across professional football stadiums in China and overseas); Spec Transparency & Longevity 5.83/10 (est. 2004, 0 text-spec models linked).
Sources, reported values & scope
Reported number
68.51
Reported unit
points
Scoring rubric edition
2026-11-24
Pillar 1: Federation certifications & event supply (max 30)
24
Pillar 2: Core R&D & weighted patents (max 25)
16.57
Pillar 3: Standards participation (max 20)
9.11
Pillar 4: Trade shows & landmark venues (max 15)
13
Pillar 5: Spec transparency & longevity (max 10)
5.83
2Nanjing Lopu Co., Ltd.202666.06 points / 100Official citation #1 ↗ Official citation #2 ↗ Original page/locator: Five-pillar score breakdown (66.06 / 100): Federation & Authority Certifications 26.20/30 (Delivered center-hung & scoring LED systems for Beijing 2022 Capital Indoor Stadium, Hangzhou Asian Games & Chengdu FISU Games; product certification is distinct from official event appointment); Core R&D & Weighted Patents 17.15/25 (Founded 1988; National High-Tech specialist in hoisting arena center-hung LED cubes and scoring integration); Standards Participation 3.51/20 (Principal drafting unit of national standard GB/T 29458-2024 for sports-venue LED displays); Trade Shows & Landmark Venues 12.70/15 (Installed at Capital Indoor Stadium, Workers Indoor Arena, Huanglong Sports Centre & FISU arenas); Spec Transparency & Longevity 6.50/10 (est. 1988, 0 text-spec models linked).
Sources, reported values & scope
Reported number
66.06
Reported unit
points
Scoring rubric edition
2026-11-24
Pillar 1: Federation certifications & event supply (max 30)
26.2
Pillar 2: Core R&D & weighted patents (max 25)
17.15
Pillar 3: Standards participation (max 20)
3.51
Pillar 4: Trade shows & landmark venues (max 15)
12.7
Pillar 5: Spec transparency & longevity (max 10)
6.5
3Leyard Optoelectronic Co., Ltd.202665.81 points / 100Official citation #1 ↗ Official citation #2 ↗ Official citation #3 ↗ Original page/locator: Five-pillar score breakdown (65.81 / 100): Federation & Authority Certifications 26.20/30 (Delivered stadium LED display & ceremony screen systems for Beijing 2008/2022 Olympics, Military World Games & FISU Games; product certification is distinct from official event appointment); Core R&D & Weighted Patents 14.18/25 (SZSE-listed (300296.SZ, FY2025 revenue CNY 7.06B) with weather-sealed stadium LED and redundant broadcast-sync technology); Standards Participation 5.55/20 (Drafting unit of both GB/T 29458-2012 and GB/T 29458-2024 national standards for sports-venue LED displays); Trade Shows & Landmark Venues 13.30/15 (Major ISE Europe participant equipping Olympic stadiums, FISU arenas & North American/European venues); Spec Transparency & Longevity 6.58/10 (est. 1995, 0 text-spec models linked).
Sources, reported values & scope
Reported number
65.81
Reported unit
points
Scoring rubric edition
2026-11-24
Pillar 1: Federation certifications & event supply (max 30)
26.2
Pillar 2: Core R&D & weighted patents (max 25)
14.18
Pillar 3: Standards participation (max 20)
5.55
Pillar 4: Trade shows & landmark venues (max 15)
13.3
Pillar 5: Spec transparency & longevity (max 10)
6.58
4Shenzhen Absen Optoelectronic Co., Ltd.202664.10 points / 100Official citation #1 ↗ Official citation #2 ↗ Official citation #3 ↗ Original page/locator: Five-pillar score breakdown (64.10 / 100): Federation & Authority Certifications 26.20/30 (A99 & SP stadium perimeter LED systems deployed across European & international football arenas meeting UEFA/FIFA specs; product certification is distinct from official event appointment); Core R&D & Weighted Patents 12.38/25 (SZSE-listed (300389.SZ, FY2025 revenue CNY 4.16B) engineering IP65 stadium perimeter modules & player-impact protection); Standards Participation 3.92/20 (Listed drafting unit of national standard GB/T 29458-2024 for sports-venue LED displays); Trade Shows & Landmark Venues 14.00/15 (Flagship ISE Europe & InfoComm presence serving stadiums across 140+ countries); Spec Transparency & Longevity 7.60/10 (est. 2001, 2 text-spec models linked).
Sources, reported values & scope
Reported number
64.10
Reported unit
points
Scoring rubric edition
2026-11-24
Pillar 1: Federation certifications & event supply (max 30)
26.2
Pillar 2: Core R&D & weighted patents (max 25)
12.38
Pillar 3: Standards participation (max 20)
3.92
Pillar 4: Trade shows & landmark venues (max 15)
14
Pillar 5: Spec transparency & longevity (max 10)
7.6
5Unilumin Group Co., Ltd. (300232.SZ)202663.45 points / 100Official citation #1 ↗ Official citation #2 ↗ Original page/locator: Five-pillar score breakdown (63.45 / 100): Federation & Authority Certifications 27.50/30 (FIBA Global Official Supplier; delivered LED scoreboards & perimeter displays for Paris 2024 Olympics & Qatar 2022 Lusail Stadium; product certification is distinct from official event appointment); Core R&D & Weighted Patents 13.52/25 (SZSE-listed (300232.SZ); patents & R&D strictly scoped to sports-venue soft-mask perimeter LED (Usport) & arena scoring cubes); Standards Participation 4.30/20 (Drafting unit of national standard GB/T 29458-2024 for sports-venue LED displays (general commercial display standards excluded)); Trade Shows & Landmark Venues 11.80/15 (Delivered Lusail Stadium, Paris 2024 venues & Manchester City Etihad Stadium LED systems (venue score aligned to verified audit)); Spec Transparency & Longevity 6.33/10 (est. 2004, 0 text-spec models linked).
Sources, reported values & scope
Reported number
63.45
Reported unit
points
Scoring rubric edition
2026-11-24
Pillar 1: Federation certifications & event supply (max 30)
27.5
Pillar 2: Core R&D & weighted patents (max 25)
13.52
Pillar 3: Standards participation (max 20)
4.3
Pillar 4: Trade shows & landmark venues (max 15)
11.8
Pillar 5: Spec transparency & longevity (max 10)
6.33
6Shenzhen Aoto Electronics Co., Ltd.202660.60 points / 100Official citation #1 ↗ Official citation #2 ↗ Official citation #3 ↗ Original page/locator: Five-pillar score breakdown (60.60 / 100): Federation & Authority Certifications 26.00/30 (SP series 18,000Hz stadium perimeter LED boards deployed across international football championships & broadcast arenas; product certification is distinct from official event appointment); Core R&D & Weighted Patents 12.41/25 (SZSE-listed (002587.SZ) holding 18,000Hz broadcast refresh control & virtual perimeter advertising patents); Standards Participation 3.92/20 (Engineered to international football broadcast flicker-free refresh and perimeter impact-safety standards); Trade Shows & Landmark Venues 10.80/15 (ISE Europe participant installed at Suzhou Olympic Sports Centre & international football stadiums); Spec Transparency & Longevity 7.47/10 (est. 1993, 1 text-spec models linked).
Sources, reported values & scope
Reported number
60.60
Reported unit
points
Scoring rubric edition
2026-11-24
Pillar 1: Federation certifications & event supply (max 30)
26
Pillar 2: Core R&D & weighted patents (max 25)
12.41
Pillar 3: Standards participation (max 20)
3.92
Pillar 4: Trade shows & landmark venues (max 15)
10.8
Pillar 5: Spec transparency & longevity (max 10)
7.47
7Kazo Vision Co., Ltd.202658.52 points / 100Official citation #1 ↗ Official citation #2 ↗ Original page/locator: Five-pillar score breakdown (58.52 / 100): Federation & Authority Certifications 23.50/30 (Multi-camera video challenge/replay officiating, referee review terminals & arena scoring integration specialist; product certification is distinct from official event appointment); Core R&D & Weighted Patents 11.10/25 (Shanghai High-Tech developer of frame-synchronized multi-angle officiating replay & clock overlay systems); Standards Participation 4.64/20 (Aligned with FIBA & FIVB video replay review and tenth-of-a-second game-clock overlay protocols); Trade Shows & Landmark Venues 13.50/15 (China Sport Show participant serving professional basketball/volleyball leagues & tournament arenas); Spec Transparency & Longevity 5.78/10 (est. 2010, 4 text-spec models linked).
Sources, reported values & scope
Reported number
58.52
Reported unit
points
Scoring rubric edition
2026-11-24
Pillar 1: Federation certifications & event supply (max 30)
23.5
Pillar 2: Core R&D & weighted patents (max 25)
11.1
Pillar 3: Standards participation (max 20)
4.64
Pillar 4: Trade shows & landmark venues (max 15)
13.5
Pillar 5: Spec transparency & longevity (max 10)
5.78
8Beijing Singolym Technology Co., Ltd.202655.45 points / 100Official citation #1 ↗ Official citation #2 ↗ Original page/locator: Five-pillar score breakdown (55.45 / 100): Federation & Authority Certifications 22.20/30 (Developer of competition timing, scoring, video replay officiating, and central results-processing systems; product certification is distinct from official event appointment); Core R&D & Weighted Patents 12.49/25 (Beijing High-Tech & Specialized SME (est. 1999) engineering multi-sport venue timing/scoring hardware & software); Standards Participation 3.51/20 (Listed drafting unit of national standard GB/T 38539-2020 and venue competition-electronics codes); Trade Shows & Landmark Venues 12.00/15 (Deployed across over 100 municipal Olympic centers, provincial games, and university gymnasiums); Spec Transparency & Longevity 5.25/10 (est. 1999, 0 text-spec models linked).
Sources, reported values & scope
Reported number
55.45
Reported unit
points
Scoring rubric edition
2026-11-24
Pillar 1: Federation certifications & event supply (max 30)
22.2
Pillar 2: Core R&D & weighted patents (max 25)
12.49
Pillar 3: Standards participation (max 20)
3.51
Pillar 4: Trade shows & landmark venues (max 15)
12
Pillar 5: Spec transparency & longevity (max 10)
5.25
9Beijing Easy Colorful Communications Technology Co., Ltd. (ECT Sports)202649.60 points / 100Official citation #1 ↗ Official citation #2 ↗ Original page/locator: Five-pillar score breakdown (49.60 / 100): Federation & Authority Certifications 20.00/30 (Manufacturer of ball-game timing/scoring consoles, 24-second shot clocks, aquatic timing & ceremony flag systems; product certification is distinct from official event appointment); Core R&D & Weighted Patents 9.41/25 (Specializes in redundant wired/wireless arena scoring consoles and LED matrix display interfaces); Standards Participation 4.30/20 (Compliant with gymnasium competition timing, master-slave clock, and ceremony synchronization standards); Trade Shows & Landmark Venues 10.50/15 (Installed in municipal gymnasiums and natatoriums; model ECT-CB20 specifications archived); Spec Transparency & Longevity 5.39/10 (est. 2006, 1 text-spec models linked).
Sources, reported values & scope
Reported number
49.60
Reported unit
points
Scoring rubric edition
2026-11-24
Pillar 1: Federation certifications & event supply (max 30)
20
Pillar 2: Core R&D & weighted patents (max 25)
9.41
Pillar 3: Standards participation (max 20)
4.3
Pillar 4: Trade shows & landmark venues (max 15)
10.5
Pillar 5: Spec transparency & longevity (max 10)
5.39
10Shanghai Listen Sports Culture Co., Ltd.202644.31 points / 100Official citation #1 ↗ Official citation #2 ↗ Original page/locator: Five-pillar score breakdown (44.31 / 100): Federation & Authority Certifications 18.80/30 (Portable & wall-mounted arena electronic scoreboards, shot clocks & LED scoring control software; product certification is distinct from official event appointment); Core R&D & Weighted Patents 9.53/25 (Backed by LED display controller engineering in Baoshan, Shanghai, building tournament scoring terminals); Standards Participation 2.48/20 (Compliant with indoor ball-game electronic scoring and shot-clock display specifications); Trade Shows & Landmark Venues 10.00/15 (Deployed across club basketball/badminton arenas, campus gyms, and amateur tournaments); Spec Transparency & Longevity 3.50/10 (est. 2014, 0 text-spec models linked).
Sources, reported values & scope
Reported number
44.31
Reported unit
points
Scoring rubric edition
2026-11-24
Pillar 1: Federation certifications & event supply (max 30)
18.8
Pillar 2: Core R&D & weighted patents (max 25)
9.53
Pillar 3: Standards participation (max 20)
2.48
Pillar 4: Trade shows & landmark venues (max 15)
10
Pillar 5: Spec transparency & longevity (max 10)
3.5

How to read & reproduce

China sports timing, scoring, and stadium LED displays are scored on the fixed 100-point five-pillar rubric with cross-sector patent caps.

Display values/units, original lexemes/units, source locators and scope can be inspected per row. Blank means undisclosed, without imputation; conversions do not add source precision.

Sector readiness, scope & methods →