Industry Indices
← Research & analysis
Editorial illustration

National standards

Original research analysis

Standards Explained | JGJ 153-2016 Stadium Lighting Design & Testing Standard: Six Illuminance Classes & Broadcast Alignment

Explains China’s core stadium lighting design code JGJ 153-2016 alongside GB/T 38539-2020: Classes I–VI illuminance tiers, horizontal vs. vertical camera lux, uniformity U1/U2, and glare GR/UGR commissioning.

Record date (source acquisition dates below) Nov 18, 2026 · Original editorial and source-scope review · Complete bilingual article and abstracts

Scope

Intended for electrical design institutes, sports-lighting contractors, and commissioning engineers.

1. Horizontal Lux vs. Vertical Camera-Facing Lux

General buildings measure only horizontal floor lux (Eh), but televised sports film vertical athletes and airborne balls. JGJ 153-2016 defines Classes I through VI—for televised tiers (IV–VI), vertical illuminance toward the main camera (Ev) and its uniformity govern broadcast quality.

2 section citations

2. JGJ 153-2016 Six Lighting Classes at a Glance

Reference hierarchy across outdoor football stadiums and indoor multipurpose arenas:

2 section citations

Scroll the table to see all fields; original units are retained.

JGJ 153 ClassTypical Venue UseReference Illuminance BandCRI & Glare Limits
Class ISchool PE, community & recreational playOutdoor football Eh ≥150–200 lx; indoor ≥200–300 lxCRI ≥65–70; outdoor GR ≤55
Class IIAmateur matches, college training & commercial clubsOutdoor football Eh ≥300 lx; indoor ≥500 lxCRI ≥70–80; outdoor GR ≤50
Class IIIProfessional competition (non-televised)Outdoor football Eh ≥500 lx; indoor ≥750 lxCRI ≥80; uniformity U1 ≥0.5–0.6, U2 ≥0.7
Class IVNational events / SD TV broadcastMain-camera vertical Ev ≥750–1,000 lxCRI ≥80; strict flicker & shadow control
Class VMajor international events / HDTV broadcastMain-camera vertical Ev ≥1,400–1,500 lxCRI ≥80–90 (≥85–90 preferred); slow-motion flicker limits
Class VIOlympics / World Cup / 4K UHD broadcastMain-camera Ev ≥2,000 lx across multi-camera planesCRI ≥90 (TLCI ≥85–90); uninterruptible instant backup

3. Night-Time Commissioning Must Measure Lux, CRI & Flicker On-Site

DIALux simulation renderings never substitute for dark-sky / blackout grid measurements of U1, U2, CRI, and flicker at commissioning.

2 section citations

Sources & retrieval dates

Documented source dates

  1. Source acquisition record