Original research analysis

Tongchuan Wangyi Fitness Centre: Systems and Landscape Design

The 2022 notice and its attachments describe construction-drawing design for intelligent systems and outdoor landscape/planting, with five document sets. The numeric total is CNY 298,650.00, but the amount in words differs. Cover signing-date and drawing-delivery-date fields are blank.

Record date (source acquisition dates below) Oct 2, 2026 · Original editorial and source-scope review

Parties and design scope

Tongchuan Wangyi District Sports Centre is the buyer; Shaanxi Fangde Architectural Engineering Design Co., Ltd. is the design provider. Both intelligent systems and outdoor landscape/planting are marked for construction-drawing design.

The table lists estimated component design fees of CNY 160,650 and CNY 138,000. The notice separately reports 4,500 m² for outdoor landscape/planting; this is not an intelligent-systems coverage figure.

1 section citations

Deliverables and an unfilled deadline

The delivery table calls for five sets of construction-drawing documents but leaves the date blank. Client-input arrangements and delay provisions do not supply a missing delivery deadline.

Design duties also include review, within-scope adjustments, technical handover and acceptance assistance. Site-service and design-change timing depends on workload, with handling in principle within 24 hours. Actual performance is unestablished.

1 section citations

Conditional payment milestones

First: 30%, or CNY 89,595.00, within 3 working days after signing.

Second: 65%, or CNY 194,122.50, within 5 working days of scheme confirmation. This trigger does not establish an additional scheme-design deliverable.

Third: 5%, or CNY 14,932.50, within 3 working days after deliverable submission. None of the three instalments is verified as paid.

1 section citations

Amount discrepancy and date limits

Read both expressions together: numeric CNY 298,650.00 and the original amount written in Chinese capital numerals, which omits the final CNY 50. The discrepancy remains unresolved; no correction or legal priority between the expressions is asserted.

The identifier is FDSJ-2022-029#. Published on 27 April 2022, the notice reports signing on 8 April and a performance period of 8 April–1 November 2022. The attachment cover is undated; the notice’s reported signing date does not fill that blank.

1 section citations
  • Chinese-language source page (www.ccgp-shaanxi.gov.cn) ↗www.ccgp-shaanxi.gov.cn · Retrieved Oct 1, 2026 Contract parties; main contract information; contract signing date; contract notice date; parent official contract notice / original frozen case identity; cover and execution page versus parent notice date

Signing, qualifications and performance limits

Both institutional seals and signing-area marks are visible in the photographs, without authentication of genuineness or authority. The cover’s Grade-A wording is a document statement, not an independently verified qualification.

The agreement makes effectiveness conditional on signing/sealing and the buyer’s deposit payment. Without payment evidence, effectiveness, delivery, review approval and acceptance dates remain unestablished.

1 section citations

Project facts & term boundaries

Procurement requirements and contract terms retain distinct sources. Budgets, ceilings, contract figures and actual payments remain separate. Performance and completion are unverified.

Buyer

Tongchuan Wangyi District Sports Center

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

Contract parties; main contract information; contract signing date; contract notice date

Design service provider

Shaanxi Fangde Architectural Engineering Design Co., Ltd.

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

Contract parties; main contract information; contract signing date; contract notice date

contract publication date

2022-04-27

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

Contract parties; main contract information; contract signing date; contract notice date

Attachment cover signature date

unknown

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

image sequence 1, contract cover

Notice-reported signature date

2022-04-08

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

parent official contract notice / original frozen case identity

signature date comparison

Notice date retained; the attachment cover is blank and no separate signature date is visible in the eight images.

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

cover and execution page versus parent notice date

design stage

construction_drawing_design_for_both_listed_scopes

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

image sequence 2, printed page 1, Article 2 scope/fee table

Source-stated contract design fee (CNY)

298650

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

image sequence 2, printed page 1, Article 2 scope/fee table

fee allocations · 0 · scope zh

Smart-systems design

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

image sequence 2, printed page 1, Article 2 scope/fee table

fee allocations · 1 · scope zh

Outdoor landscaping and greening works

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

image sequence 2, printed page 1, Article 2 scope/fee table

amount wording discrepancy · numeric fee text

298650.00

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

image sequences 2–3, printed pages 1–2, numeric total and Article 5 amount in words

amount wording discrepancy · amount in words transcribed zh

(amount in Chinese capital numerals; see the Chinese page)

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

image sequences 2–3, printed pages 1–2, numeric total and Article 5 amount in words

amount wording discrepancy · status

unresolved_internal_document_wording_discrepancy

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

image sequences 2–3, printed pages 1–2, numeric total and Article 5 amount in words

amount wording discrepancy · corrected authoritative amount

unknown

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

image sequences 2–3, printed pages 1–2, numeric total and Article 5 amount in words

deliverables · 0 · deliverable zh

Construction drawing design

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

image sequence 3, printed page 2, Articles 3–5

deliverables · 0 · due date

unknown

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

image sequence 3, printed page 2, Articles 3–5

deliverables · 0 · due date field state

blank in Article 4 table

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

image sequence 3, printed page 2, Articles 3–5

payment schedule · 0 · percent

30

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

image sequence 3, printed page 2, Articles 3–5

payment schedule · 0 · amount cny

89595

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

image sequence 3, printed page 2, Articles 3–5

payment schedule · 0 · trigger zh

After the contract is signed

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

image sequence 3, printed page 2, Articles 3–5

payment schedule · 0 · due interval

3

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

image sequence 3, printed page 2, Articles 3–5

payment schedule · 0 · due unit

working days

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

image sequence 3, printed page 2, Articles 3–5

payment schedule · 1 · percent

65

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

image sequence 3, printed page 2, Articles 3–5

payment schedule · 1 · amount cny

194122.5

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

image sequence 3, printed page 2, Articles 3–5

payment schedule · 1 · trigger zh

After the scheme is confirmed

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

image sequence 3, printed page 2, Articles 3–5

payment schedule · 1 · due interval

5

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

image sequence 3, printed page 2, Articles 3–5

payment schedule · 1 · due unit

working days

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

image sequence 3, printed page 2, Articles 3–5

payment schedule · 2 · percent

5

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

image sequence 3, printed page 2, Articles 3–5

payment schedule · 2 · amount cny

14932.5

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

image sequence 3, printed page 2, Articles 3–5

payment schedule · 2 · trigger zh

After deliverables are submitted

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

image sequence 3, printed page 2, Articles 3–5

payment schedule · 2 · due interval

3

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

image sequence 3, printed page 2, Articles 3–5

payment schedule · 2 · due unit

working days

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

image sequence 3, printed page 2, Articles 3–5

outdoor area in notice only · area m2

4500

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

parent official contract notice / original frozen case identity

outdoor area in notice only · scope

outdoor landscape and planting only

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

parent official contract notice / original frozen case identity

notice performance period preserved · start

2022-04-08

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

parent official contract notice / original frozen case identity

notice performance period preserved · end

2022-11-01

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

parent official contract notice / original frozen case identity

evidence boundary

Historical signed-form attachment terms only. Cover date and delivery-date cells are blank; parent notice dates stay separately sourced. Payment triggers do not prove payment or deliverable completion.

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

producer bounded review; absence is scoped to reviewed materials

actual payment amount cny

unknown

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

producer bounded review; absence is scoped to reviewed materials

actual design delivery date

unknown

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

producer bounded review; absence is scoped to reviewed materials

actual completion acceptance date

unknown

Source notice/attachment term. Payment triggers do not prove payment, delivery or completion. Blank attachment signature dates remain unknown; Tongchuan amount-in-words conflict remains unresolved.

producer bounded review; absence is scoped to reviewed materials